Más
Idioma
Modo de visualización
Sven Yrvindvídeo
22 de octubre de 2025 · 4 min · 3K visitas
Qué cubre este vídeo
Sven Yrvind installs a custom-fabricated swim ladder on the port side of his vessel.▶ 0:27 After having a welder reinforce the mounting points, he tests the ladder's structural integrity by stepping on the rungs.▶ 0:02 The design features pipes that lean outward to improve foot placement visibility, though Yrvind notes the pipes are slightly shorter than ideal, complicating the drilling process for the mounting holes.▶ 0:52 He secures the assembly using 3.5mm cotter pins, noting that the actual diameter of the hardware is smaller than the nominal 4mm specification.▶ 3:23 The installation process requires individual fitting for each rung, with plans to glue the components in place once the alignment is finalized.▶ 3:37 The ladder provides a functional boarding point, and Yrvind intends to replicate the process for the starboard side.▶ 0:14 Proper alignment and secure mounting are essential for ensuring the ladder can withstand the downward force of a person boarding from the water.
Más de Sven Yrvind
De Sven Yrvind — mira el barco del canal, la tripulación y cada vídeo analizado.