Acorn To Arabellavídeo

Acorn to Arabella - Journey of a Wooden Boat - Episode 49: Bedding the Frames

7 de diciembre de 2018 · 17 min · 159K visitas · Worcester, Massachusetts

Qué cubre este vídeo

The construction of the wooden boat Arabella moves toward the planking phase as the crew prepares to install steam-bent oak frames into the keel timber.0:05 To ensure precise reinstallation, the team marks each frame with its specific position using a permanent marker before sanding and oiling.6:22 The process involves securing the frames with number 18 silicon bronze flat-head screws to prevent galvanic corrosion and iron sickness in the oak.9:15 To ensure a tight fit and prevent damage to the screw heads, the crew modifies standard screwdriver tips by grinding away the taper.9:51 Before driving the screws with a bit and brace, they drill pilot holes with a tapered bit and coat the threads in toilet bowl wax to provide lubrication and a water-resistant seal.10:19 The team also repurposes components from the vessel Victoria, moving spars to a new boathouse level and removing hardware for winter storage.3:02

Ver en YouTube

Más de Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... Againoct 2026Saying Goodbye to Newfoundland—and the Man Who Inspired Arabellasept 2026Upgrading the Rudder and Another Trek To The Cliffago 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjul 2026

De Acorn To Arabella — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema