Acorn To Arabellavídeo

Acorn to Arabella - Journey of a Wooden Boat - Episode 49: Bedding the Frames

7 de dezembro de 2018 · 17 min · 159K visualizações · Worcester, Massachusetts

O que este vídeo aborda

The construction of the wooden boat Arabella moves toward the planking phase as the crew prepares to install steam-bent oak frames into the keel timber.0:05 To ensure precise reinstallation, the team marks each frame with its specific position using a permanent marker before sanding and oiling.6:22 The process involves securing the frames with number 18 silicon bronze flat-head screws to prevent galvanic corrosion and iron sickness in the oak.9:15 To ensure a tight fit and prevent damage to the screw heads, the crew modifies standard screwdriver tips by grinding away the taper.9:51 Before driving the screws with a bit and brace, they drill pilot holes with a tapered bit and coat the threads in toilet bowl wax to provide lubrication and a water-resistant seal.10:19 The team also repurposes components from the vessel Victoria, moving spars to a new boathouse level and removing hardware for winter storage.3:02

Assistir no YouTube

Mais de Acorn To Arabella

We Stripped Our Wooden Sailboat Back to Bare Wood... Againout. de 2026Saying Goodbye to Newfoundland—and the Man Who Inspired Arabellaset. de 2026Upgrading the Rudder and Another Trek To The Cliffago. de 2026We're Climbing a Wall No One Has Ever Climbed Before | Rock Climbing on Newfoundland's South Coastjul. de 2026

De Acorn To Arabella — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema