Sailing Squibvídeo
Squib Refit - Painting the upper deck - Cockpit locker restoration - more shade in the cockpit - /89
17 de octubre de 2024 · 19 min · 960 visitas
Qué cubre este vídeo
The refit of the boat Squib involves extensive exterior painting, cockpit shade installation, and the refurbishment of seven cockpit lockers. The owner applies two coats of paint to the exterior hull and foredeck, leaving specific areas clear for the future application of KiwiGrip non-skid coating. To address high summer temperatures, the crew installs a custom-sewn shade canopy using a keder rail mounted between the solar panels and the arch, secured with bungee cords to provide cockpit coverage.
The locker refurbishment requires removing seven hatch lids, which involves extracting numerous corroded or seized fasteners. The owner uses a combination of manual wrenches, an electric drill, and a Dremel tool to remove stubborn screws, occasionally resorting to drilling out bolts or using a ring wrench to break the tension on seized nuts. After removal, the lids are sanded and prepped for painting. The owner also fits a custom kitchen cabinet shell into the interior, requiring adjustments to the bulkhead laminate to ensure a proper fit.0:56 Consistent maintenance and hardware standardization simplify the removal process for multi-part deck components.
Más de Sailing Squib
De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



