Sailing Squibvídeo

Squib's Refit - Antenna Mounts Stern Rail - Electrical Conduits - Galley Trim Strip /107

20 de febrero de 2025 · 17 min · 734 visitas

Qué cubre este vídeo

The owner of the sailboat Squib performs several refit tasks, including installing antenna mounts, routing electrical conduits, and finishing interior cabinetry. To mount an AIS antenna and a radar detector on the stern arch, he fabricates custom aluminum brackets and drills mounting holes, noting that the radar detector’s original design required rail mounting.2:23 He installs a waterproof cable gland on the arch to feed the antenna and radar cables into the vessel, using a cable tie as a makeshift fish tape to pull the wires through the arch.4:47 Inside the galley, he sands and fills fiberglass laminates with a mixture of epoxy, Aerosil, and microballoons to create smooth surfaces for future paneling.7:25 He also installs flexible conduit for refrigerator wiring, lighting, and 230V outlets, securing the tubing with epoxy and wooden blocks.12:55 To facilitate panel installation, he shapes and glues wooden trim strips beneath the galley windows.10:30 The work concludes with the owner and a friend applying a final layer of thickened epoxy to seal the galley surfaces.16:07

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026 /4oct 2026Sailing Squib - May 2026/3sept 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema