Sailing Squibvídeo

Sailing Squib - May 2026 /4

1 de octubre de 2026 · 19 min · 17 visitas

Qué cubre este vídeo

Refitting the interior and exterior of the boat Squib involves installing a new water heater, mounting outboard motor brackets, and finishing cabin paneling. The owner installs a new water heater by securing it to the existing bulkhead, requiring only minor drilling and plumbing connections.Watch He fabricates and mounts custom brackets for both a gasoline and an electric outboard motor, ensuring clearance for the shower hose hatch.2:13 Interior work includes installing white panels over previously raw wood surfaces and constructing a custom housing for the wind instrument, which requires shortening the data cable and securing the mounting bracket with perforated metal strapping.5:00 To improve mast rake and backstay tension, the owner fabricates two stainless steel plates for the forestay, drilling 10mm holes using cobalt bits and manual cooling techniques.14:31 Additionally, he discovers the rudder has jumped its lower mounting point while the boat is on the hard, likely due to external impact from construction machinery, and plans to use a car jack and wooden block to realign it.18:36

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sept 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema