Sven Yrvindvídeo
19 Aug 2025 Gimbal project hearing compleation
18 de agosto de 2025 · 4 min · 2K visitas
Qué cubre este vídeo
Sven Yrvind modifies a gimbal mechanism for his boat, focusing on clearance and structural fit. The assembly uses a new plywood component that initially interfered with the surrounding bulkhead, requiring removal and adjustment to prevent contact.▶ 1:54 Yrvind grinds down the top hinges to eliminate friction against the wall and installs a latching mechanism to secure the unit in a closed position.▶ 2:47 He applies epoxy to the opposite side of the gimbal to create a smooth, durable edge.▶ 3:31 A winch provides the necessary tension for the system.▶ 3:13 These adjustments ensure the gimbal rotates freely without binding against the interior structure. Testing the mechanism remains the final step for the next day.
Más de Sven Yrvind
De Sven Yrvind — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



