Project Brupegvídeo

Fabricating Bollards on an expedition boat - Project Brupeg Ep.373

15 de septiembre de 2024 · 31 min · 26K visitas

Qué cubre este vídeo

Damien and Jess fabricate and install custom stainless steel bollards on their 6.5-foot-draft expedition boat, *Brewpeg*, to improve mooring capabilities for upcoming cadet training voyages. The project involves welding a side bollard and a double-post bow bollard onto reinforced stainless deck pads.3:52 To ensure structural integrity, the team uses gussets for bracing and welds the bow bollards together with a horizontal beam.14:44 Before moving the vessel from a shallow wharf, the crew uses a handheld sounder in a dinghy to map the surrounding depths and identify potential hazards like sandbars.1:16 Despite 25-knot winds, Damien performs TIG welding on the deck, utilizing the leeward side for stability.22:45 The installation requires grinding back existing deck paint, which the owners plan to touch up later.22:09 The new bollards provide multiple tie-off configurations, including single-side and wrap-around options, to accommodate various docking scenarios.27:39

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept 2026

De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema