Project Brupegvídeo

Fabricating Bollards on an expedition boat - Project Brupeg Ep.373

15 de setembro de 2024 · 31 min · 26K visualizações

O que este vídeo aborda

Damien and Jess fabricate and install custom stainless steel bollards on their 6.5-foot-draft expedition boat, *Brewpeg*, to improve mooring capabilities for upcoming cadet training voyages. The project involves welding a side bollard and a double-post bow bollard onto reinforced stainless deck pads.3:52 To ensure structural integrity, the team uses gussets for bracing and welds the bow bollards together with a horizontal beam.14:44 Before moving the vessel from a shallow wharf, the crew uses a handheld sounder in a dinghy to map the surrounding depths and identify potential hazards like sandbars.1:16 Despite 25-knot winds, Damien performs TIG welding on the deck, utilizing the leeward side for stability.22:45 The installation requires grinding back existing deck paint, which the owners plan to touch up later.22:09 The new bollards provide multiple tie-off configurations, including single-side and wrap-around options, to accommodate various docking scenarios.27:39

Assistir no YouTube

Mais de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463out. de 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462set. de 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461set. de 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460set. de 2026

De Project Brupeg — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema