RAN Sailingvídeo

Big Design Change: Flipping The Interior Layout - Ep. 428 RAN Sailing

7 de febrero de 2025 · 21 min · 120K visitas · Skåne

Qué cubre este vídeo

Construction of a 50-foot sailboat continues with the fabrication of structural bulkheads using vacuum bagging and West System epoxy. To accelerate curing in a cold barn environment, electric blankets provide localized heat, maintaining surface temperatures between 28 and 35 degrees Celsius.9:48 The build team reinforces bulkheads near the mast with two layers of 600g Bi-X and one layer of 300g woven fiberglass on each side.6:12 A significant design change involves flipping the interior layout to consolidate the galley and its storage into a single area, while relocating the head and shower entrance away from the cooking space.16:32 Future work includes engineering chain plate reinforcements with carbon fiber to accommodate separated top and lower shrouds, a process involving consultation with a naval architect to manage load paths.19:06 The team plans to delay cutting door openings in complex, narrow bulkheads until after lamination to prevent panel deformation.20:34

Ver en YouTube

Más de RAN Sailing

Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502sept 2026This Is Where Boat Builds Break People - Ep. 501 Ran Sailingago 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailingago 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailingago 2026

De RAN Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema