RAN Sailingvideo

Big Design Change: Flipping The Interior Layout - Ep. 428 RAN Sailing

7 febbraio 2025 · 21 min · 120K visualizzazioni · Skåne

Cosa tratta questo video

Construction of a 50-foot sailboat continues with the fabrication of structural bulkheads using vacuum bagging and West System epoxy. To accelerate curing in a cold barn environment, electric blankets provide localized heat, maintaining surface temperatures between 28 and 35 degrees Celsius.9:48 The build team reinforces bulkheads near the mast with two layers of 600g Bi-X and one layer of 300g woven fiberglass on each side.6:12 A significant design change involves flipping the interior layout to consolidate the galley and its storage into a single area, while relocating the head and shower entrance away from the cooking space.16:32 Future work includes engineering chain plate reinforcements with carbon fiber to accommodate separated top and lower shrouds, a process involving consultation with a naval architect to manage load paths.19:06 The team plans to delay cutting door openings in complex, narrow bulkheads until after lamination to prevent panel deformation.20:34

Guarda su YouTube

Altro da RAN Sailing

Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502set 2026This Is Where Boat Builds Break People - Ep. 501 Ran Sailingago 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailingago 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailingago 2026

Da RAN Sailing — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema