See me at seavídeo

Tres semanas en el astillero - Parte 2

22 de junio de 2025 · 27 min · 2K visitas

Qué cubre este vídeo

Nova Loman installs a dedicated through-hull fitting and ball valve for the galley sink drainage on her 1970s sailboat to replace a shared drainage system that caused poor flow and odors. She drills the new hole through the hull, grinds away the silicone-based antifouling paint, and removes the wood core around the opening to replace it with fiberglass for a watertight seal. After completing the plumbing, she prepares the hull for launch by cleaning, priming, and applying a new coat of antifouling paint in sections to accommodate boatyard supports. She also polishes the hull to restore the finish damaged by fenders. With the bottom work finished, she prepares to step the mast while navigating through thick fog. Proper through-hull installation requires removing the core material to prevent water ingress, while sectioned painting allows for maintenance around support stands during a haul-out.

Ver en YouTube

Más de See me at sea

My boat and I take a vacation on the standing mast routeoct 2026I Thought I Was Going to Lose My Boat - The Storyoct 2026Running aground + GPS interference in the North seasept 2026Transiting the Kiel Canal with an electric motorsept 2026

De See me at sea — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema