See me at seavidéo

Trois semaines au chantier naval - Partie 2

22 juin 2025 · 27 min · 2K vues

Ce que couvre cette vidéo

Nova Loman installs a dedicated through-hull fitting and ball valve for the galley sink drainage on her 1970s sailboat to replace a shared drainage system that caused poor flow and odors. She drills the new hole through the hull, grinds away the silicone-based antifouling paint, and removes the wood core around the opening to replace it with fiberglass for a watertight seal. After completing the plumbing, she prepares the hull for launch by cleaning, priming, and applying a new coat of antifouling paint in sections to accommodate boatyard supports. She also polishes the hull to restore the finish damaged by fenders. With the bottom work finished, she prepares to step the mast while navigating through thick fog. Proper through-hull installation requires removing the core material to prevent water ingress, while sectioned painting allows for maintenance around support stands during a haul-out.

Regarder sur YouTube

Plus de vidéos de See me at sea

My boat and I take a vacation on the standing mast routeoct. 2026I Thought I Was Going to Lose My Boat - The Storyoct. 2026Running aground + GPS interference in the North seasept. 2026Transiting the Kiel Canal with an electric motorsept. 2026

De See me at sea — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème