Sailing Triteiavídeo
Completing the Install of my New Beta 20 Diesel Engine in Phuket Thailand
8 de junio de 2026 · 56 min · 29K visitas · Phuket
Boatbuilder hammers cutlass bearing into Beta 20 sternpost under daylight
Qué cubre este vídeo
Installing a new Beta 20 diesel engine in an Alberg 30 requires significant modifications to the exhaust system and engine mounts to ensure proper alignment and prevent seawater ingestion.13:36 Because the engine sits below the waterline, a high-rise exhaust elbow and an anti-siphon loop are necessary to prevent back-siphoning.2:51 When replacing an engine, the existing prop shaft flange may not match the new gearbox coupling, requiring a custom-ordered part.12:46 During the installation, the owner also replaced a worn cutlass bearing by having a larger unit machined down to the required 1 3/8-inch size.15:20 To secure the new cutlass bearing, the owner coated it in epoxy resin before tapping it into place and tightening the lock screws.29:12 The engine installation process involves rough alignment, drilling new holes in the engine bed arms, and plumbing a new 18-gallon poly fuel tank.36:12 Proper alignment requires bolting the coupling to the gearbox before securing the flange to the prop shaft to maintain access to the mounting nuts.41:38
Barcos en este vídeo
Más de Sailing Triteia
De Sailing Triteia — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



