Wildling Sailingvídeo

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refit

2 de octubre de 2026 · 27 min · 102K visitas · Portugal

Qué cubre este vídeo

The host of Wildling Sailing performs a structural refit on a catamaran in a boatyard to repair water-damaged daggerboard slots and hull-to-deck joints.5:09 After discovering rot in plywood stringers and structural voids caused by years of water ingress, the host excavates the damaged areas, removes rotten wood, and replaces it with new exterior-grade plywood and closed-cell XPS foam insulation.4:10 The repair process involves creating cardboard templates for precise wood cuts, bonding components with West System epoxy and colloidal silica, and sealing the joints with fiberglass to ensure a watertight finish.15:54 While shoring up the hull, the host identifies two points of deformation on the port bow and starboard stern, which are stabilized with wooden wedges to prevent further structural stress while the boat sits on the hard.9:54 The project requires extensive sanding, fairing, and structural reinforcement to address previous inadequate epoxy-only repairs. The host manages the work in high temperatures, utilizing both fast and slow-setting hardeners to control curing times during the lamination process.23:29

Ver en YouTube

Más de Wildling Sailing

I Lifted Her Out For a Very Important Rebuild.sept 2026One Final Refit Before Crossing The Atlantic.ago 20262 Days Alone at Sea On my Primitive Double-Canoe.ago 2026A Night Passage Through Orca Territoryjul 2026

De Wildling Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema