Sailing Umavídeo

Sailboat DIY Head Renovation (Part 2) — Sailing Uma [Step 133]

9 de agosto de 2018 · 16 min · 224K visitas

Qué cubre este vídeo

The crew renovates the head on their boat, Uma, focusing on plumbing, wall finishes, and cabinetry. To meet legal requirements for a holding tank, they construct a DIY unit using a two-foot length of 4-inch PVC pipe.0:27 They install a Whale 1 1/8-inch check valve inside a modified P-trap to create an anti-siphon vented loop for the toilet, which sits below the waterline.2:31 The project includes replacing a seized gate valve with a standard lever seacock and re-bedding the through-hull fitting.4:24 For interior finishes, they apply peel-and-stick stone and vinyl tiles to the head walls using 3M adhesive foam.8:19 The vanity top is fabricated from Corian, requiring multiple attempts and extensive sanding from 80 to 1500 grit to achieve a seamless finish.12:03 Finally, they install a fold-out cabinet door using a custom PVC bracket system that allows for easy removal without dismantling the surrounding structure.14:15

Ver en YouTube

Más de Sailing Uma

We Ditched Our Steering Wheel (And Built Something Better) | Step 496sept 2026We're Finally Setting Sail Again!sept 20264 Hours to Rig Solar for an 8-Month Solo Circumnavigationsept 2026Solar Sponsor Backed Out Before Sailing Around the World !sept 2026

De Sailing Uma — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema