Sailing Umavideo

Sailboat DIY Head Renovation (Part 2) — Sailing Uma [Step 133]

August 9, 2018 · 16 min · 224K views

What this video covers

The crew renovates the head on their boat, Uma, focusing on plumbing, wall finishes, and cabinetry. To meet legal requirements for a holding tank, they construct a DIY unit using a two-foot length of 4-inch PVC pipe.0:27 They install a Whale 1 1/8-inch check valve inside a modified P-trap to create an anti-siphon vented loop for the toilet, which sits below the waterline.2:31 The project includes replacing a seized gate valve with a standard lever seacock and re-bedding the through-hull fitting.4:24 For interior finishes, they apply peel-and-stick stone and vinyl tiles to the head walls using 3M adhesive foam.8:19 The vanity top is fabricated from Corian, requiring multiple attempts and extensive sanding from 80 to 1500 grit to achieve a seamless finish.12:03 Finally, they install a fold-out cabinet door using a custom PVC bracket system that allows for easy removal without dismantling the surrounding structure.14:15

Watch on YouTube

More from Sailing Uma

We're Finally Setting Sail Again!Sep 20264 Hours to Rig Solar for an 8-Month Solo CircumnavigationSep 2026Solar Sponsor Backed Out Before Sailing Around the World !Sep 2026Our boat won’t look the same after this | Step 495Aug 2026

From Sailing Uma — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue