MJ Sailingvídeo
CATAMARAN BUILD - I've Finally Figured It Out!! (MJ Sailing - Ep 216)
26 de diciembre de 2021 · 18 min · 76K visitas · Kent Island
Qué cubre este vídeo
Matt and Jessica install the foredeck and side decks on their 42-foot custom catamaran build.0:10 To position the foredeck, the crew uses ladders and manual lifting to clear the hull lip before securing it with thickened resin.5:00 The team then bonds the side decks using methacrylate adhesive, working in low 50-degree temperatures that require the use of heating lamps to ensure proper curing.6:37 To manage the adhesive application, they store the bonding agent in a heated marina bathroom to maintain workability.10:14 During the port-side deck installation, the crew miscalculates the required adhesive volume by one kilogram, resulting in excess squeeze-out that they scrape and reuse in other joints.16:30 They use temporary cleats to level the deck sections during the bonding process.15:03 The installation of these components allows the hull to take its final shape, providing a walkable surface and defining the cabin window layout.17:18
Más de MJ Sailing
De MJ Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



