MJ Sailingvídeo

CATAMARAN BUILD - I've Finally Figured It Out!! (MJ Sailing - Ep 216)

26 de dezembro de 2021 · 18 min · 76K visualizações · Kent Island

O que este vídeo aborda

Matt and Jessica install the foredeck and side decks on their 42-foot custom catamaran build.0:10 To position the foredeck, the crew uses ladders and manual lifting to clear the hull lip before securing it with thickened resin.5:00 The team then bonds the side decks using methacrylate adhesive, working in low 50-degree temperatures that require the use of heating lamps to ensure proper curing.6:37 To manage the adhesive application, they store the bonding agent in a heated marina bathroom to maintain workability.10:14 During the port-side deck installation, the crew miscalculates the required adhesive volume by one kilogram, resulting in excess squeeze-out that they scrape and reuse in other joints.16:30 They use temporary cleats to level the deck sections during the bonding process.15:03 The installation of these components allows the hull to take its final shape, providing a walkable surface and defining the cabin window layout.17:18

Ver no YouTube

Mais de MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)08/2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)07/2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)06/2026Preparing Our Catamaran for Paint—and Me for Captain's School06/2026

De MJ Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema