RAN Sailingvídeo

Core Structural Component Installed In Our 50ft Sailboat - Ep. 433 RAN Sailing

14 de marzo de 2025 · 24 min · 107K visitas · Skåne

Qué cubre este vídeo

Construction of a 50-foot sailboat continues in a farm workshop in southern Sweden, focusing on the installation of a structural lengthwise bulkhead.Watch To provide sound insulation between the guest cabin and a secondary cabin, the lower section of this bulkhead uses a 50mm PET foam core, twice the thickness of the upper 25mm section.11:06 This increased thickness also supports the weight of the salon sole, sofa, and navigation station.11:17 After laminating the fiberglass and vacuum bagging the panel, the crew cuts it to shape using a combination of a router, jigsaw, and palm router.15:31 The project also involves installing a new $1,200 two-stage cyclone dust extraction system to manage fine particulates in the wood shop.8:13 Future work will involve building a 2.7-meter span for the salon sofa and sole, requiring heavy tabbing to transfer structural loads into the hull and bulkheads.19:53 Doubling the core thickness significantly increases the stiffness of the sandwich panel.18:28

Ver en YouTube

Más de RAN Sailing

There's No Manual For This! Building Our Own 52ft Sailboat - Ep. 506 Ran Sailingoct 2026Carbon Pillars & No Dorade Boxes! - Building Our 52ft Sailboat - Ep. 505 Ran Sailingoct 2026Will the Sanding EVER End? Building Our Dreamboat - Ep. 503 Ran Sailingsept 2026Something's Not Right Here! Building Our 52ft Sailboat - Ep. 502sept 2026

De RAN Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema