RAN Sailingvidéo

Core Structural Component Installed In Our 50ft Sailboat - Ep. 433 RAN Sailing

14 mars 2025 · 24 min · 106K vues · Skåne

Ce que couvre cette vidéo

Construction of a 50-foot sailboat continues in a farm workshop in southern Sweden, focusing on the installation of a structural lengthwise bulkhead.Watch To provide sound insulation between the guest cabin and a secondary cabin, the lower section of this bulkhead uses a 50mm PET foam core, twice the thickness of the upper 25mm section.11:06 This increased thickness also supports the weight of the salon sole, sofa, and navigation station.11:17 After laminating the fiberglass and vacuum bagging the panel, the crew cuts it to shape using a combination of a router, jigsaw, and palm router.15:31 The project also involves installing a new $1,200 two-stage cyclone dust extraction system to manage fine particulates in the wood shop.8:13 Future work will involve building a 2.7-meter span for the salon sofa and sole, requiring heavy tabbing to transfer structural loads into the hull and bulkheads.19:53 Doubling the core thickness significantly increases the stiffness of the sandwich panel.18:28

Regarder sur YouTube

Plus de vidéos de RAN Sailing

This Is Where Boat Builds Break People - Ep. 501 Ran Sailingaoût 2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailingaoût 2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailingaoût 2026Making Our Sailboat One Solid Structure - Ep. 498 Ran Sailingaoût 2026

De RAN Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème