MJ Sailingvídeo
Our First Glassing Job Came to Bite Us in the AS$ (MJ Sailing - Ep 342)
21 de septiembre de 2024 · 17 min · 57K visitas · United States
Qué cubre este vídeo
Fairing the cabin sole of a custom catamaran reveals significant structural unevenness, with gaps reaching 10 millimeters between the bridge deck and hull sections.4:06 Initial plans to use polyester fairing compound proved impractical due to excessive weight, while thin foam strips failed to address the complex, varying topography of the floor.5:05 The builders considered using two-part, eight-pound density pourable foam to fill the voids, a material previously used for stringer reinforcement and freezer insulation, but they are awaiting confirmation from the boat designer before proceeding.16:11 Preparatory work involves sanding the entire floor surface with a high-speed palm sander and a dual-action sander to remove resin drips and residual peel ply.2:15 To facilitate winter construction, the crew installed a portable, heated work shed provided by a neighbor, which also provides additional electrical outlets for power tools.10:26 Proper surface preparation and structural leveling are essential for achieving a uniform, comfortable cabin sole finish.
Más de MJ Sailing
De MJ Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



