MJ Sailingvídeo
Our First Glassing Job Came to Bite Us in the AS$ (MJ Sailing - Ep 342)
21 de setembro de 2024 · 17 min · 57K visualizações · United States
O que este vídeo aborda
Fairing the cabin sole of a custom catamaran reveals significant structural unevenness, with gaps reaching 10 millimeters between the bridge deck and hull sections.4:06 Initial plans to use polyester fairing compound proved impractical due to excessive weight, while thin foam strips failed to address the complex, varying topography of the floor.5:05 The builders considered using two-part, eight-pound density pourable foam to fill the voids, a material previously used for stringer reinforcement and freezer insulation, but they are awaiting confirmation from the boat designer before proceeding.16:11 Preparatory work involves sanding the entire floor surface with a high-speed palm sander and a dual-action sander to remove resin drips and residual peel ply.2:15 To facilitate winter construction, the crew installed a portable, heated work shed provided by a neighbor, which also provides additional electrical outlets for power tools.10:26 Proper surface preparation and structural leveling are essential for achieving a uniform, comfortable cabin sole finish.
Mais de MJ Sailing
De MJ Sailing — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



