Sailing Squibvídeo

Squib's Refit - Switch panel - Engine cover plates - Jigging device - USB connector /116

24 de abril de 2025 · 16 min · 764 visitas

Qué cubre este vídeo

Refitting the 30-foot sailboat Squib involves extensive fiberglass repair, electrical system upgrades, and the fabrication of a custom mast-stepping device. The owner sands engine cover plates using an orbital sander and a Dremel to smooth grip holes before applying epoxy and primer.1:55 Electrical work focuses on wiring three switch panels, connecting positive and negative bus bars, and installing USB 3.0 charging ports in the forward cabin.9:53 Challenges include sourcing specific metric and imperial hardware, managing cable routing through tight bilge channels, and drilling precise holes for wiring without clear sightlines behind bulkheads.5:18 To facilitate future mast maintenance, the owner constructs a custom jig using a modified spinnaker pole fitting that inserts into the mast base.8:13 The electrical system is tested by connecting a temporary overhead light to the newly wired distribution panels.7:25 The project emphasizes the necessity of meticulous cable management and the use of 4:1 heat-shrink tubing to ensure secure, waterproof connections for varied wire gauges.6:32

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sept 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema