Project Brupegvídeo

Brupeg's New Crew Alena - Project Brupeg Ep.409

7 de julio de 2025 · 31 min · 24K visitas

Qué cubre este vídeo

The 60-foot trawler Brupeg transits the Queensland coast from Airlie Beach toward Townsville to conduct a week-long training program for 60 Australian Navy Cadets. The crew, including new member Alena, manages a 10-hour steam to Upstart Bay, maintaining a speed of seven knots to optimize fuel consumption. To correct a 4-to-5-degree starboard list caused by wind and swell, the crew uses a deck wash pump and a food-grade hose to transfer ballast water from the starboard tank to the port tank. The vessel navigates around Cape Upstart and the island known as The Bun to avoid shallow water charted near the mainland. During the passage, the crew identifies a mechanical issue with the anchor swivel, which fails to seat correctly on the shackles. They plan to mark the anchor chain at five-meter intervals to improve depth accuracy during future deployments. The vessel utilizes Chute Harbour for refueling and water, noting the site’s suitability for larger vessels and significant cost savings compared to other marinas.

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept 2026

De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema