Entre Terras e Maresvídeo

FINALLY in the WATER, BUT... only with the REFURBISHED SUP BOARD S1.EP132

18 de agosto de 2024 · 16 min · 313 visitas

Qué cubre este vídeo

The crew restores a damaged stand-up paddleboard by sanding, priming, and painting the hull to prepare it for use. The process begins by removing old paint and imperfections from previous fiberglass repairs using 80-grit sandpaper.Watch The team progresses through 150, 220, and 320-grit sandpaper to achieve a smooth surface, using a compressor to clear dust before applying a primer coat.0:40 To optimize the painting process, the board is suspended to allow for simultaneous coating of both sides.9:04 The EVA deck pad remains masked during the application of the primer and the final white paint to prevent overspray, as a suitable replacement pad is not yet available.8:36 After the final coat, the board shows a uniform finish, covering previous patches and laminations.10:29 The project concludes with the board painted white, awaiting further detailing.13:23

Ver en YouTube

Más de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun 2026This week the focus was on something elsejun 2026

De Entre Terras e Mares — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema