Entre Terras e Maresvidéo

FINALLY in the WATER, BUT... only with the REFURBISHED SUP BOARD S1.EP132

18 août 2024 · 16 min · 313 vues

Ce que couvre cette vidéo

The crew restores a damaged stand-up paddleboard by sanding, priming, and painting the hull to prepare it for use. The process begins by removing old paint and imperfections from previous fiberglass repairs using 80-grit sandpaper.Watch The team progresses through 150, 220, and 320-grit sandpaper to achieve a smooth surface, using a compressor to clear dust before applying a primer coat.0:40 To optimize the painting process, the board is suspended to allow for simultaneous coating of both sides.9:04 The EVA deck pad remains masked during the application of the primer and the final white paint to prevent overspray, as a suitable replacement pad is not yet available.8:36 After the final coat, the board shows a uniform finish, covering previous patches and laminations.10:29 The project concludes with the board painted white, awaiting further detailing.13:23

Regarder sur YouTube

Plus de vidéos de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183juil. 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182juin 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181juin 2026This week the focus was on something elsejuin 2026

De Entre Terras e Mares — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème