Entre Terras e Maresvidéo
FINALLY in the WATER, BUT... only with the REFURBISHED SUP BOARD S1.EP132
18 août 2024 · 16 min · 313 vues
Ce que couvre cette vidéo
The crew restores a damaged stand-up paddleboard by sanding, priming, and painting the hull to prepare it for use. The process begins by removing old paint and imperfections from previous fiberglass repairs using 80-grit sandpaper.Watch The team progresses through 150, 220, and 320-grit sandpaper to achieve a smooth surface, using a compressor to clear dust before applying a primer coat.0:40 To optimize the painting process, the board is suspended to allow for simultaneous coating of both sides.9:04 The EVA deck pad remains masked during the application of the primer and the final white paint to prevent overspray, as a suitable replacement pad is not yet available.8:36 After the final coat, the board shows a uniform finish, covering previous patches and laminations.10:29 The project concludes with the board painted white, awaiting further detailing.13:23
Plus de vidéos de Entre Terras e Mares
De Entre Terras e Mares — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



