Sven Yrvindvídeo
16 Aug Port side hatch hardware
15 de agosto de 2025 · 3 min · 1K visitas
Qué cubre este vídeo
Sven Yrvind prepares the port side hatch hardware on his boat by installing eight lines through 30mm thick material.▶ 0:27 To facilitate the installation, he uses a chain hoist to heel the vessel onto its port side.▶ 0:24 He secures the lines by applying super glue to stiffen the ends, then grinds the tips to a fine, pen-like point to ease their passage through the drilled holes.▶ 1:04 After realizing the initial plan required eight lines rather than four, he mixes additional epoxy to complete the installation.▶ 2:43 He reinforces the knots by dipping them directly into the epoxy mixture to ensure a secure hold.▶ 3:16 This process demonstrates a method for stiffening and sharpening thick line ends for hardware installation using readily available adhesives and manual grinding.
Más de Sven Yrvind
De Sven Yrvind — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



