Sailing Squibvídeo

Squib’s Refit - Preparations for the freezer installation - Rub rails - Electrical work /55

22 de febrero de 2024 · 20 min · 807 visitas

Qué cubre este vídeo

The refit of the 30-foot pocket catamaran *Squib* focuses on installing a 70-liter dual-zone freezer, upgrading electrical cabling, and fabricating custom rub rails.7:06 To accommodate the freezer, the crew constructs a custom plywood support structure, requiring precise templates to account for the hull's non-orthogonal geometry.1:01 The installation includes a dedicated, enclosed space for a 40-cm-wide holding tank, positioned to maintain passage width in the cabin.1:07 Electrical upgrades involve replacing undersized, overheating fan wiring with 50-square-millimeter cables, which are routed through newly installed conduits to avoid the bilge.14:11 Additionally, the crew fabricates new rub rails by laminating two layers of Okoume strips, using clamps to match the hull's curvature, and repurposes old teak grating into a cockpit table.10:53 The project also includes cutting a new mounting panel for electrical switches and laminating a bulkhead hole to seal the interior.12:33 Proper template-making and the use of waterproof plywood are essential for structural modifications in irregular boat spaces.3:40

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sept 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema