Sailing Squibvidéo

Squib’s Refit - Preparations for the freezer installation - Rub rails - Electrical work /55

22 février 2024 · 20 min · 807 vues

Ce que couvre cette vidéo

The refit of the 30-foot pocket catamaran *Squib* focuses on installing a 70-liter dual-zone freezer, upgrading electrical cabling, and fabricating custom rub rails.7:06 To accommodate the freezer, the crew constructs a custom plywood support structure, requiring precise templates to account for the hull's non-orthogonal geometry.1:01 The installation includes a dedicated, enclosed space for a 40-cm-wide holding tank, positioned to maintain passage width in the cabin.1:07 Electrical upgrades involve replacing undersized, overheating fan wiring with 50-square-millimeter cables, which are routed through newly installed conduits to avoid the bilge.14:11 Additionally, the crew fabricates new rub rails by laminating two layers of Okoume strips, using clamps to match the hull's curvature, and repurposes old teak grating into a cockpit table.10:53 The project also includes cutting a new mounting panel for electrical switches and laminating a bulkhead hole to seal the interior.12:33 Proper template-making and the use of waterproof plywood are essential for structural modifications in irregular boat spaces.3:40

Regarder sur YouTube

Plus de vidéos de Sailing Squib

Sailing Squib - May 2026/3sept. 2026Sailing Squib May 2026 /2août 2026Sailing Squib - Contemporary Witnessjuil. 2026Sailing Squib - May 2026 /1juil. 2026

De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème