Sailing Catalpavídeo
It’s been a hell of a week Ep 407
14 de mayo de 2024 · 16 min · 12K visitas · Mexico
Qué cubre este vídeo
The crew of the Catalpa performs deck repairs and mainsail installation while waiting for missing sail battens in a boatyard. After discovering soft, rotten core material around deck-mounted boxes and dorade vents, the crew cuts back the damaged sections, removes wet wood, and fills the voids with thickened epoxy containing fiberglass fibers.3:27 They also oversize the bolt holes for new mushroom vents, filling them with epoxy to prevent future water ingress into the deck core.14:04 Simultaneously, the crew attempts to install a new mainsail from Precision Sails.2:06 They encounter initial difficulty with the bolt rope size but successfully hoist and furl the sail to test the boom angle and furling mechanism.2:19 The crew notes that the next anchorage is 100 nautical miles away, making a functional mainsail essential before splashing.8:29 They continue addressing deck penetrations and rot to ensure the vessel is watertight before returning to the water.14:49
Más de Sailing Catalpa
De Sailing Catalpa — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



