Sailing Catalpavideo

It’s been a hell of a week Ep 407

14 maggio 2024 · 16 min · 12K visualizzazioni · Mexico

Cosa tratta questo video

The crew of the Catalpa performs deck repairs and mainsail installation while waiting for missing sail battens in a boatyard. After discovering soft, rotten core material around deck-mounted boxes and dorade vents, the crew cuts back the damaged sections, removes wet wood, and fills the voids with thickened epoxy containing fiberglass fibers.3:27 They also oversize the bolt holes for new mushroom vents, filling them with epoxy to prevent future water ingress into the deck core.14:04 Simultaneously, the crew attempts to install a new mainsail from Precision Sails.2:06 They encounter initial difficulty with the bolt rope size but successfully hoist and furl the sail to test the boom angle and furling mechanism.2:19 The crew notes that the next anchorage is 100 nautical miles away, making a functional mainsail essential before splashing.8:29 They continue addressing deck penetrations and rot to ensure the vessel is watertight before returning to the water.14:49

Guarda su YouTube

Altro da Sailing Catalpa

they weren't expecting thisset 2026one of the most remote islands on the planetset 202629 days sailing Panama to French Polynesia the whole passageago 2026what did we learn from a month at seaago 2026

Da Sailing Catalpa — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema