PAT | FRANKIEvídeo

We have to tell you something.. (+ keel removal) | BOAT DAMAGE DISASTER Part 4

17 de noviembre de 2024 · 21 min · 33K visitas · Tenerife

Qué cubre este vídeo

Structural damage to the hull and keel requires a complete interior teardown, including the removal of all floorboards and cabinetry.1:59 The repair process involves using heavy tools to break through layers of Sikaflex and adhesive used in the original floor construction.3:13 During the disassembly, the crew attempts to remove the nearly 4-ton keel to inspect the hull-to-keel joint and assess the extent of the damage.11:36 The process proves difficult as the keel remains stuck to the hull despite the removal of all keel bolts, requiring the use of a travel lift and custom-fitted wooden supports to safely separate the components.17:57 Due to the ongoing uncertainty and the lack of a concrete repair timeline, the owners officially cancel their planned Atlantic crossing with the ARC.7:15 The insurance company has authorized two independent surveyors to conduct a full investigation of the vessel to determine the viability of future repairs.20:57

Ver en YouTube

Más de PAT | FRANKIE

12.5 days of REALITY crossing the Atlantic Ocean | Part 3 #sailingjun 2025Atlantic Crossing Part 2 | The Night from Hell + Discovering Cape Verdemay 2025Leaving Everything Behind - The First 900 NM | Atlantic Crossing Part 1abr 2025The ULTIMATE Shakedown Sailfeb 2025

De PAT | FRANKIE — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema