PAT | FRANKIEvideo
We have to tell you something.. (+ keel removal) | BOAT DAMAGE DISASTER Part 4
November 17, 2024 · 21 min · 33K views · Tenerife
What this video covers
Structural damage to the hull and keel requires a complete interior teardown, including the removal of all floorboards and cabinetry.1:59 The repair process involves using heavy tools to break through layers of Sikaflex and adhesive used in the original floor construction.3:13 During the disassembly, the crew attempts to remove the nearly 4-ton keel to inspect the hull-to-keel joint and assess the extent of the damage.11:36 The process proves difficult as the keel remains stuck to the hull despite the removal of all keel bolts, requiring the use of a travel lift and custom-fitted wooden supports to safely separate the components.17:57 Due to the ongoing uncertainty and the lack of a concrete repair timeline, the owners officially cancel their planned Atlantic crossing with the ARC.7:15 The insurance company has authorized two independent surveyors to conduct a full investigation of the vessel to determine the viability of future repairs.20:57
More from PAT | FRANKIE
From PAT | FRANKIE — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



