RAN Sailingvídeo
Back to Boat Building - Ep. 399 RAN Sailing
21 de junio de 2024 · 15 min · 170K visitas · Skåne
Qué cubre este vídeo
Johan and Malin continue the construction of their 50-foot sailboat, having reached the stage where all temporary internal frames and support stands are removed from the hull.0:06 The hull exhibits sufficient stiffness to proceed without the temporary supports, provided additional bracing remains in the bow, stern, and between the cradle boxes.10:02 The next phase of construction involves rough-sanding the interior to remove epoxy squeeze-out, filling screw holes and gaps with thickened epoxy, and applying three layers of fiberglass lamination.10:30 Following lamination, the build will focus on constructing a keel grid consisting of two lengthwise stringers and 10 floors to manage keel-generated forces, followed by the installation of bulkheads and interior components.11:23 To facilitate this work, the crew organized their workshop by building sturdy storage shelves from scrap wood.6:17 Outside the boat-building project, the family manages gardening tasks at their farm, including harvesting potatoes and addressing issues with slugs and invasive weeds.7:24
Más de RAN Sailing
De RAN Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



