Sailing Squibvídeo
Squib´s Refit - Painting - Sail track - Removing battery bank - Neighboring wreck /88
10 de octubre de 2024 · 19 min · 725 visitas
Qué cubre este vídeo
The owner of the vessel Squib performs a series of refit tasks while preparing for a planned departure in mid-August. Projects include installing a new keder rail for a sunshade between the arch and the cabin roof, which involves drilling, filling holes with thickened epoxy, and countersinking screws.4:18 To facilitate engine maintenance, the owner laminates two wooden blocks onto the cabin ceiling to support a future block-and-tackle system for lifting the motor.4:57 Additional work involves removing dead battery banks and obsolete electrical components from the starboard engine compartment, as well as stripping old fittings and stanchions for polishing.8:52 The owner sands the deckhouse and side decks in preparation for painting, though progress is hampered by rain and the need to clean bird droppings from the surfaces.9:45 The owner also coordinates with a local marine shop, Maritimo, to source new control cables and a replacement furling system for the genoa.13:26
Más de Sailing Squib
De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



