Sailing Squibvideo
Squib´s Refit - Painting - Sail track - Removing battery bank - Neighboring wreck /88
October 10, 2024 · 19 min · 725 views
What this video covers
The owner of the vessel Squib performs a series of refit tasks while preparing for a planned departure in mid-August. Projects include installing a new keder rail for a sunshade between the arch and the cabin roof, which involves drilling, filling holes with thickened epoxy, and countersinking screws.4:18 To facilitate engine maintenance, the owner laminates two wooden blocks onto the cabin ceiling to support a future block-and-tackle system for lifting the motor.4:57 Additional work involves removing dead battery banks and obsolete electrical components from the starboard engine compartment, as well as stripping old fittings and stanchions for polishing.8:52 The owner sands the deckhouse and side decks in preparation for painting, though progress is hampered by rain and the need to clean bird droppings from the surfaces.9:45 The owner also coordinates with a local marine shop, Maritimo, to source new control cables and a replacement furling system for the genoa.13:26
More from Sailing Squib
From Sailing Squib — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



