Sailing Squibvídeo

Squib's Refit - Installing front roof supports - Finalizing rub rail - Side railing /102

16 de enero de 2025 · 19 min · 766 visitas

Qué cubre este vídeo

Peter and Sabina perform structural modifications on their boat, Squib, focusing on installing forward roof support struts and finalizing the rub rail. To support the roof, they fabricate and mount stainless steel tubes, using existing hardware from an old sunshade to save costs.9:33 Because the vessel’s hull is not perfectly symmetrical—with the port side deck measuring 18 mm wider than the starboard—the crew prioritizes visual alignment over precise millimeter measurements when positioning the struts.11:54 They reinforce the mounting points from the interior using custom-fitted wooden backing plates, which are bonded in place with epoxy mixed with wood dust and Aerosil.17:11 The process involves drilling through-holes, cleaning surfaces with acetone, and using butyl tape for sealing washers.0:48 Additionally, the crew completes the installation of the rub rail, filling gaps with epoxy and ensuring the final fit is secure.16:11 The project requires iterative adjustments to the wooden supports and hardware to ensure the roof structure remains rigid and parallel to the rail.

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sept 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema