Sailing Squibvideo

Squib's Refit - Installing front roof supports - Finalizing rub rail - Side railing /102

16 gennaio 2025 · 19 min · 766 visualizzazioni

Cosa tratta questo video

Peter and Sabina perform structural modifications on their boat, Squib, focusing on installing forward roof support struts and finalizing the rub rail. To support the roof, they fabricate and mount stainless steel tubes, using existing hardware from an old sunshade to save costs.9:33 Because the vessel’s hull is not perfectly symmetrical—with the port side deck measuring 18 mm wider than the starboard—the crew prioritizes visual alignment over precise millimeter measurements when positioning the struts.11:54 They reinforce the mounting points from the interior using custom-fitted wooden backing plates, which are bonded in place with epoxy mixed with wood dust and Aerosil.17:11 The process involves drilling through-holes, cleaning surfaces with acetone, and using butyl tape for sealing washers.0:48 Additionally, the crew completes the installation of the rub rail, filling gaps with epoxy and ensuring the final fit is secure.16:11 The project requires iterative adjustments to the wooden supports and hardware to ensure the roof structure remains rigid and parallel to the rail.

Guarda su YouTube

Altro da Sailing Squib

Sailing Squib - May 2026/3set 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnesslug 2026Sailing Squib - May 2026 /1lug 2026

Da Sailing Squib — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema