Sailing Into the Mysticvídeo

S2, Ep15 Removing and Replacing All Old Through Hulls in Just a Weekend

23 de marzo de 2025 · 22 min · 198 visitas · Oceanside

Qué cubre este vídeo

The crew of *Into the Mystic* replaces eight through-hull fittings and valves during a multi-day haul-out.1:07 To expedite removal, they cut the old fittings out rather than unscrewing them, a technique recommended by their boatyard mentor.3:22 After cleaning and painting the bilge surfaces, they install the new through-hulls using silicone sealant and custom-made dog-leg tools to tighten the backing nuts.17:55 The project also involves cleaning the propeller and shaft, though the crew struggles to source the correct PSS shaft seal, initially purchasing an incorrectly sized unit from West Marine before identifying the proper 2.25-inch replacement.15:02 They also perform maintenance on the propeller anodes and prepare the rudder and sensor locations for professional fiberglass work.17:09 The crew notes that the physical labor of working in cramped bilge compartments is demanding and suggests that hiring professionals for such tasks is often worth the cost.20:51

Ver en YouTube

Más de Sailing Into the Mystic

Disaster in La Paz: Where is our Dinghy? [Ep 65]ago 2026Beauty Don't Stop Us, We Gotta Get to La Paz Ep64ago 2026Rip to the Tip - Sailing the Last Leg to Cabo [Ep 63]ago 2026Are we Sailing...or Motoring?? [Ep 62]jul 2026

De Sailing Into the Mystic — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema