Sailing Into the Mysticvidéo

S2, Ep15 Removing and Replacing All Old Through Hulls in Just a Weekend

23 mars 2025 · 22 min · 198 vues · Oceanside

Ce que couvre cette vidéo

The crew of *Into the Mystic* replaces eight through-hull fittings and valves during a multi-day haul-out.1:07 To expedite removal, they cut the old fittings out rather than unscrewing them, a technique recommended by their boatyard mentor.3:22 After cleaning and painting the bilge surfaces, they install the new through-hulls using silicone sealant and custom-made dog-leg tools to tighten the backing nuts.17:55 The project also involves cleaning the propeller and shaft, though the crew struggles to source the correct PSS shaft seal, initially purchasing an incorrectly sized unit from West Marine before identifying the proper 2.25-inch replacement.15:02 They also perform maintenance on the propeller anodes and prepare the rudder and sensor locations for professional fiberglass work.17:09 The crew notes that the physical labor of working in cramped bilge compartments is demanding and suggests that hiring professionals for such tasks is often worth the cost.20:51

Regarder sur YouTube

Plus de vidéos de Sailing Into the Mystic

Disaster in La Paz: Where is our Dinghy? [Ep 65]août 2026Beauty Don't Stop Us, We Gotta Get to La Paz Ep64août 2026Rip to the Tip - Sailing the Last Leg to Cabo [Ep 63]août 2026Are we Sailing...or Motoring?? [Ep 62]juil. 2026

De Sailing Into the Mystic — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème