Entre Terras e Maresvídeo

INSTALAMOS A CUBA DA PIA DO CAMAROTE DE POPA T1.ep174

12 de abril de 2026 · 26 min · 274 visitas

Qué cubre este vídeo

Edgar and Sâmia install a sink basin in the aft cabin head of their boat, requiring structural modifications to the vanity cabinetry.3:00 Because the basin does not fit the existing opening, Edgar uses a laminate trimmer with a circular guide to cut a 25-centimeter hole in the wooden countertop.18:13 He reinforces the installation by creating custom wooden supports, which are secured with mechanical fasteners and sealed with polyurethane (PU) adhesive.17:52 To prevent water damage to the exposed wood, he plans to apply multiple coats of epoxy once humidity levels drop.22:56 The project includes positioning a faucet and installing a tankless water heater, which requires routing gas and water lines through the vanity structure.22:44 To mitigate safety risks associated with the gas heater, the installation will incorporate a gas detection system linked to a solenoid valve at the main tank.25:23 The sink placement is verified to ensure the head door remains fully functional when the faucet is in use.24:30

Ver en YouTube

Más de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun 2026This week the focus was on something elsejun 2026

De Entre Terras e Mares — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema