More
Language
Display mode
Entre Terras e Maresvideo
April 12, 2026 · 26 min · 273 views
What this video covers
Edgar and Sâmia install a sink basin in the aft cabin head of their boat, requiring structural modifications to the vanity cabinetry.▶ 0:46 Because the basin does not fit the existing opening, Edgar uses a laminate trimmer with a circular guide to cut a 25-centimeter hole in the wooden countertop.▶ 18:13 He reinforces the installation by creating custom wooden supports, which are secured with mechanical fasteners and sealed with polyurethane (PU) adhesive.▶ 17:28 To prevent water damage to the exposed wood, he plans to apply multiple coats of epoxy once humidity levels drop.▶ 22:56 The project includes positioning a faucet and installing a tankless water heater, which requires routing gas and water lines through the vanity structure.▶ 22:11 To mitigate safety risks associated with the gas heater, the installation will incorporate a gas detection system linked to a solenoid valve at the main tank.▶ 25:23 The sink placement is verified to ensure the head door remains fully functional when the faucet is in use.▶ 23:53
More from Entre Terras e Mares
From Entre Terras e Mares — see the channel’s boat, crew, and every analyzed video.