Sailing Puffinvídeo
Asking YOU what to do? (Bulkheads and Masts) - Episode 13 - DIY Free Sailboat Refit
4 de julio de 2021 · 10 min · 1K visitas
Qué cubre este vídeo
Archie, owner of a Colvik Sailor 26 named Puffin, is evaluating a major structural refit after discovering widespread water intrusion and misalignment issues.0:16 The deck core around the mast step and cabin top shows signs of saturation, evidenced by mushy plywood and water drainage from deck fittings.1:59 The mast base fittings are loose, and the standing rigging plates require replacement.2:26 Additionally, the interior bulkheads appear misaligned and potentially installed incorrectly by a previous owner, complicating efforts to use them as reference points for structural repairs.5:55
To address these issues, the proposed plan involves unstepping the mast to remove deck weight, replacing the saturated core, and potentially removing and rebuilding the bulkheads from scratch to ensure proper alignment.3:45 The project also requires replacing all deteriorated blocks and running rigging.8:49 The primary challenge remains establishing a level baseline for structural work on a boat that is not currently level.10:13 The owner is weighing the necessity of a full-scale deck and bulkhead restoration against the labor and budget constraints of the DIY project.9:14
Barcos en este vídeo
Más de Sailing Puffin
De Sailing Puffin — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



