Sailing Puffinvídeo
Will this End in Disaster ? - Episode 26 - Free Sailboat Refit
21 de noviembre de 2021 · 7 min · 721 visitas
Qué cubre este vídeo
Archie strips the mast of Puffin, removing instrumentation, rigging, and the rolling furling headsail components.4:37 He leaves existing cables and lines inside the mast to serve as messenger lines for pulling new wiring.5:03 After removing the mast, he moves it to a secure position on blocks underneath the boat.5:54 To facilitate further refit work during inclement weather, he plans to construct a protective shelter over the deck.6:06 He intends to remove the rubbing strake to utilize its existing mounting holes for securing the shelter's wooden support posts.6:09 Once the shelter is complete, he will install a diesel heater, routing the exhaust through the cockpit drains.6:26 He has ordered a tarpaulin to cover the vessel and protect the work area.6:42
Barcos en este vídeo
Más de Sailing Puffin
De Sailing Puffin — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



