Sail Vessel Khalifavídeo
#27 Four Days of Rough Seas! Our Longest Crossing, Heading to the Caribbean!
30 de noviembre de 2025 · 1h 1m · 12K visitas · Natal
Qué cubre este vídeo
A 38-foot sailboat departs Natal, Brazil, for a 15-day, non-stop passage to the Caribbean, sailing in company with two other vessels. Before departure, the crew installs a Schenker watermaker, selecting the unit for its low power consumption of approximately 6 amps per hour while producing 30 liters of water.6:00 During the transit, the crew manages a "wing-on-wing" sail configuration to navigate the South Atlantic, utilizing a preventer on the mainsail to mitigate the risk of an accidental jibe in following seas.33:11 When the autopilot struggles to maintain a steady course in 20-to-30-knot winds and large, fast-moving swells, the captain manually steers by reference to the moon to reduce the load on the autopilot’s hydraulic pump.42:27 The crew also resolves a persistent squealing noise from the rudder assembly by applying white grease to the stainless steel rudder shaft.40:01 The passage involves maintaining a routine for the child on board, including dedicated play areas and meal preparation, while adapting to the physical demands of offshore sailing.
Más de Sail Vessel Khalifa
De Sail Vessel Khalifa — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



