Sail Vessel Khalifavídeo
#27 Four Days of Rough Seas! Our Longest Crossing, Heading to the Caribbean!
30 de novembro de 2025 · 1h 1m · 12K visualizações · Natal
O que este vídeo aborda
A 38-foot sailboat departs Natal, Brazil, for a 15-day, non-stop passage to the Caribbean, sailing in company with two other vessels. Before departure, the crew installs a Schenker watermaker, selecting the unit for its low power consumption of approximately 6 amps per hour while producing 30 liters of water.6:00 During the transit, the crew manages a "wing-on-wing" sail configuration to navigate the South Atlantic, utilizing a preventer on the mainsail to mitigate the risk of an accidental jibe in following seas.33:11 When the autopilot struggles to maintain a steady course in 20-to-30-knot winds and large, fast-moving swells, the captain manually steers by reference to the moon to reduce the load on the autopilot’s hydraulic pump.42:27 The crew also resolves a persistent squealing noise from the rudder assembly by applying white grease to the stainless steel rudder shaft.40:01 The passage involves maintaining a routine for the child on board, including dedicated play areas and meal preparation, while adapting to the physical demands of offshore sailing.
Mais de Sail Vessel Khalifa
De Sail Vessel Khalifa — veja o barco, a tripulação e cada vídeo analisado do canal.
The Sailing Directory Newsletter
Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.



