Sail Lifevídeo

The HELLISH headliner saga 🙄

8 de septiembre de 2024 · 20 min · 83K visitas

Qué cubre este vídeo

Replacing the headliner on a 44-foot catamaran involves creating templates from 5mm plywood strips, which are then used to cut final panels that account for the thickness of the vinyl covering.13:59 To ensure a precise fit, each panel is trimmed by approximately one millimeter on all sides before applying vinyl with contact adhesive.16:24 The process requires removing existing fixtures, such as air conditioning vents, and drilling new holes for cabin lighting.14:38 Materials for the project include 19 yards of vinyl, spray adhesive, and a dedicated spray gun, totaling approximately $260.12:36 During the installation, the project was delayed by a failing air compressor and the need to fabricate additional support structures for the panels.15:15 The work remains ongoing, with the forward and aft cabins still requiring full headliner installation.18:40 Before committing to the purchase of a separate hurricane-damaged catamaran project, the engines—two 2018 Yanmar 3YM30AEs—were successfully bench-tested and started using a gravity-fed fuel system.2:56

Ver en YouTube

Barcos en este vídeo

Antares Yachts 44Revisado

Más de Sail Life

The road back to boat work: The square eagle has landed! Ep. 695sept 2026The road back to boat work: We're gravel rich & ready for shipping containers! Ep. 694sept 2026Can I build an aluminum fuel tank with the xTool MetalFab laser welder and CNC? Ep. 693ago 2026The road back to boat work: shipping delays, site prep and bending metal with a 3D print Ep. 692ago 2026

De Sail Life — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema