Sail Lifevídeo

The HELLISH headliner saga 🙄

8 de setembro de 2024 · 20 min · 83K visualizações

O que este vídeo aborda

Replacing the headliner on a 44-foot catamaran involves creating templates from 5mm plywood strips, which are then used to cut final panels that account for the thickness of the vinyl covering.13:59 To ensure a precise fit, each panel is trimmed by approximately one millimeter on all sides before applying vinyl with contact adhesive.16:24 The process requires removing existing fixtures, such as air conditioning vents, and drilling new holes for cabin lighting.14:38 Materials for the project include 19 yards of vinyl, spray adhesive, and a dedicated spray gun, totaling approximately $260.12:36 During the installation, the project was delayed by a failing air compressor and the need to fabricate additional support structures for the panels.15:15 The work remains ongoing, with the forward and aft cabins still requiring full headliner installation.18:40 Before committing to the purchase of a separate hurricane-damaged catamaran project, the engines—two 2018 Yanmar 3YM30AEs—were successfully bench-tested and started using a gravity-fed fuel system.2:56

Assistir no YouTube

Barcos neste vídeo

Antares Yachts 44Revisado

Mais de Sail Life

The road back to boat work: The square eagle has landed! Ep. 695set. de 2026The road back to boat work: We're gravel rich & ready for shipping containers! Ep. 694set. de 2026Can I build an aluminum fuel tank with the xTool MetalFab laser welder and CNC? Ep. 693ago. de 2026The road back to boat work: shipping delays, site prep and bending metal with a 3D print Ep. 692ago. de 2026

De Sail Life — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema