Sailing Blue Pearlvídeo

Ep 69 | Life on the hard

10 de marzo de 2024 · 22 min · 3K visitas · Puerto Rico

Qué cubre este vídeo

The crew of the Blue Pearl performs extensive refit work while hauled out in a boatyard, focusing on electrical upgrades and through-hull valve maintenance. Chris and Jessica Hanna install an 800-amp-hour lithium battery bank, replacing old wiring with 4/0 cable to prevent voltage drop to the windlass.5:23 They also rebuild a 1982 Maxwell Nilsson windlass motor, which had previously failed due to a lack of available parts.7:59 During a routine inspection of 11 through-hull fittings, the crew discovers several valves seized in place or improperly installed with excessive 3M 5200 adhesive.17:26 Using heat and a custom-fabricated tool, they remove five problematic through-hull fittings for replacement.14:35 The project also includes troubleshooting an AC unit and a dishwasher, the latter of which was damaged by shore power at San Felipe Marina.9:58 The crew sources parts from Home Depot, West Marine, and online retailers while managing the logistical challenges of obtaining marine-specific supplies in the United States.2:53

Ver en YouTube

Más de Sailing Blue Pearl

Our Precious Daisy Mae💔jun 2026Ep 100 | The Grand Finalejun 2025Ep 99 | A great adventure!may 2025Ep 98 | Our big newsmay 2025

De Sailing Blue Pearl — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema